West London · 7 min
Wood Fibre Internal Insulation Upgrade in Ealing
A cold front room in a solid-wall property was upgraded with wood fibre and breathable finishes for better comfort.
Breathable insulation, Lime plastering
Read Case Study
Central London · 5 min
Cement Removal and Lime Rebuild in Camden
Dense cement patches were carefully removed and replaced with breathable layers to stabilise a historic wall assembly.
Cement removal, Lime plastering
Read Case Study
North London · 4 min
Breathable Finish Refresh in Barnet
A period room was refreshed with breathable finishing layers after prior incompatible paint had failed.
Breathable finishes, Lime plastering
Read Case Study