Project facts
- Property: Edwardian family home
- Duration: 2 days on site
- Scope: One reception room
- Materials: Mineral primer, breathable finish coats
Case Study · North London
A period room was refreshed with breathable finishing layers after prior incompatible paint had failed.
Non-breathable paint had begun to fail over previously restored lime surfaces, leaving blotchy sheen and patching.
We removed unstable coatings, checked substrate readiness, and applied a compatible breathable finish system.
The room gained a consistent matte finish with preserved breathability and easier long-term maintenance.
"The finish is calm and elegant, and they gave clear care guidance."
Next Step
Send your photos and a short note and we will advise likely scope, materials and next steps.